Blower pump
For cleaning the drill hole after drilling
Description
- For cleaning the drill hole after drilling.
- Necessary to ensure that the resin adheres correctly: Approximately 25% less hold if the drill hole is not cleaned, blown out and brushed following drilling.
Béton
Parpaing Plein/pierre
Brique pleine
Béton cellulaire
Asphalte
Béton
Parpaing Plein/pierre
Brique pleine
Béton cellulaire
Asphalte
Product variants
|
Designation 3 variants |
Capacité | Condt | Surcondt | Reference |
|---|---|---|---|---|
|
POMPE SOUFFLANTE 580 cm3
|
580 cm3 | Sachet de 1 | 1 sachet |
A030040
|
|
POMPE SOUFFLANTE (Grand modèle) 990 cm3
|
990 cm3 | Sachet de 1 | 1 sachet |
A030045
|
|
POMPE SOUFFLANTE
|
580 cm3 | Sachet de 1 | 5 sachets |
A851350
|
Technical informations - Utilisation
![]() |
|---|
